Saturday, September 5, 2009

2 days at Dad's

We finished the peak, insulated the shed and got enough OSB on to have the 7'x7' overhead door installed this coming week.



We also ripped out the original 3' high north retaining wall and replaced it with a 6' high beefier wall on Saturday.

Of course, with 2 blocks to go, a Universal joint failed on the skid-steer, giving Gerald something to work on while the rest of us continued working on the shed:

At the end of the day and all blocks installed that we had:

There are more blocks on the way to complete the wall.

No comments: